Clients
RUSAL’s main products are primary aluminium, aluminium alloys, foil and alumina. The company has access to vast resources of raw materials and provides the entire production cycle. find out more


Sustainable development
In 2009 RUSAL completed a large-scale project to modernise the Krasnoyarsk smelter. The renovation resulted in in its production efficiency increasing considerably and a reduction in its emissions. find out more


Bratsk Aluminium Smelter

The Bratsk smelter, one of the largest in the world, became the first aluminium producing facility globally to reach a capacity of one million tonnes. It takes only 4 days to deliver the smelter’s products to China which is the world’s largest and fastest growing aluminium market.

Geography

Bratsk, Russia

Products

Primary aluminium, alloys (slabs, small ingots, T-bars, electrical wire rod)

Consumers

Automotive, construction, packaging, electrical, metals and mining industries

Annual production capacity

1 million tonnes of aluminium

Energy source

Bratsk HPP

Smelting technology

“Dry” anode technology

Development

In 2013, the Bratsk smelter produced 1,001,918.2 tonnes of primary aluminium, a 1% increase year-on-year. Key efficiency indicators also improved: current efficiency went up by 0.4% to 88.48%; average daily pot output increased by 0.97% to 1184.73 kg; while specific electricity consumption went down by 0.93% to 15,934 KW*h/t.

Labour productivity in 2013 was raised 1.1% year-on-year, through lower labour costs and higher output, to 248.1 tonnes per person. The achievement meant that workers’ earnings were increased to the average level of 47,400 roubles per month.

In 2013, the smelter continued its environmental modernisation programme. As one of the project activities, the design of four highly efficient gas treatment plants was completed; equipment is already being delivered to the site, and one plant is being assembled. Also, a pilot area was commissioned, which has 23 pots equipped with automatic feeders of raw materials. As part of the same programme, reconstruction of waste disposal areas and landscaping of the smelter’s sanitary protection zone were continued. The production waste processing area was upgraded, and the industrial laboratory was given new environmental monitoring instruments. Total environmental investments in 2013 exceeded 700 mln roubles.

Сертификаты

ISO 14001: 2004 (environmental management standard)

ISO 9001:2008 (quality management standard)

OHSAS 18 001 (health and safety management standard)

Headcount

4000 people

Management

Andrey Volvenkin, Managing Director

Contacts

phone: +7 (3953) 49-26-50
BRAZ-GDG-OFFICE@rusal.com